<P>① resurgence of the weather, the general air moisture content is quite high. So we can not open the window ventilation, but should close the doors and windows,плавающий пол деревянная панель when necessary, should also open the air conditioning or other dehumidification equipment to reduce the moisture in the air.</P>
<P>② the installation of the geothermal system of the family, but also should always pay attention to the existence of the following pipeline is the phenomenon of rupture,пластиковый забор бангкок such as the edge of the edge of the tide phenomenon should be immediately treated to avoid the development of the floor from the arch. Encountered a large area from the arch phenomenon, but also should open the floor in time to leak.</P>
<P>③ the wooden floor arch of the circle of the floor until the wall of all the tilt, and then find one or two pieces of the floor cut off a small, and then put these wooden floor and then installed back to the original, so the floor is not Will be squeezed because of the wet expansion of the arch,о поставщиках деревянных пластиковых композитов and so dry the gap will not shrink a lot of wood, the general laying of the work of the floor will do.</P>
Welcome to GTR Culture Forums
|
|
Guest Message by DevFuse |
Page 1 of 1
The processing method of wooden floor arches The processing method of wooden floor arches
Page 1 of 1